Helios Yatırım Enerji Ürt. San. ve Tic. A.Ş. 2x(3x3/0) AWG Power Distribution Line with Concrete Pole (Salihli / Manisa)

It is  2x(3x3/0) power distribution line with concrete pole between 16 MVA Distribution Building (MOD 5b) and 16 MVA Distribution Building (Mod 5a) intended to connect to energy distribution lines of GDZ Elektrik produced by the completer 16 MW solar power plant. The project has been prepared by our company and has been approveed by Tedaş. Temporary acceptance was made.

 

Location:

    Province: Manisa

    City: Salihli

    Neighbourhood: Dombaylı

Length: 2600 m