In order to connect the energy produced by 7x1 MW SPP to the grid of GDZ Elektrik's distribution lines, the transmission line project was prepared. The approval was done by TEDAŞ. The installation was made by our firm and temporary acceptance was completed.
Project Details
Location:
Province: Manisa
City: Salihli
Neighbourhood: Adala
Length: 1500 m
Conductor: 3x3/0 AWG
Transmission Line: One circuit Iron-poled with string isolator